These Photos Show the Progress of the Building without all the Extra Stuff!
This is the campground in the fall of 2014. The Tahoe is parked in the future building site
In December of 2014, Papi and Michael started preparing the site by cutting the trees that had to go. The rock ledge would be at the left of the picture.
In March of 2015, Papi met with Deryl Osborn, the builder
April, 2015, the site is ready but the rains are on the way...
By August, 2015, the building has begun.
Early September, 2015
Late September, 2015
Late October, 2015
Early December, 2015
March 7, 2016
Siding, windows and doors mostly installed
Below is the artist's rendering of the original house plans.
June 29, 2016
Stairs and railings installed
December 2016
Heat, electricity, water, most appliances (a hiccup with the clothes washer), sewer odor eliminated...